Roosevelt University

Roosevelt University - Boiler and Piping

Engineer: Edwards Engineering, Inc

  • Furnish and install four 150 BHP hot water boilers
  • Furnish and install new hot water primary and secondary piping systems
  • Remove, furnish and install replacement finned tube baseboard for a 400,000 sq. ft. building
  • Work completed in 65 days while building was fully occupied
  • Brand Logo
  • Brand Logo
  • Brand Logo
  • Brand Logo
  • Brand Logo
  • Brand Logo
  • Brand Logo
  • Brand Logo
  • Brand Logo
  • Brand Logo
  • Brand Logo