Edwards Engineering was tasked with the replacement of two 100% Outside Air Make-Up Air Units that serve the hallways of the multi-family building at 1000 W Adams.
VIEW PROJECTEdwards Engineering completed services for the three 20-story condominium towers with common areas at Optima.
VIEW PROJECTThe 1150 Lake Shore property manager came to Edwards Engineering requesting a solution for their parking garage that would incorporate safety and energy savings. The garage did not have any sensors to monitor carbon monoxide levels.
VIEW PROJECTSoon after performing complete renovation of the building, Group Fox Management awarded Edwards Engineering with a maintenance agreement to maintain the HVAC equipment at The Lofts at River East.
VIEW PROJECT